made.

You are paying for judgement, not drawings.

The fee pays for the thinking, and for seeing it through.

how fees work
  1. 1 · conceptA fixed fee, set by project type, size and site.
  2. 2 · pricingA quantity surveyor prices the concept.
  3. 3 · later stagesA percentage of that estimate, less half of the concept fee.
  4. 4 · other costsSurveyor, engineers, QS and council, outside our fee.
more on how fees work

Concept is a fixed fee, set by the type of project, its size and its site. It covers the design concept, plans, renders of the street frontage, living and kitchen, main bedroom, bathroom and one outdoor space, and two rounds of revisions.

Then a quantity surveyor prices the concept, so the budget is tested before the detailed work begins.

Later stages are a percentage of the QS estimate, agreed once the estimate is known: developed design, detailed design and consent, and design management during the build. Half of the concept fee is credited to them.

What lowers it: a smaller or simpler brief, an easier site, leading finishes and specification yourself, or running the build yourself. Each moves work, and the decisions that come with it, to you.

Other costs to budget for, outside our fee:

  • SurveyorMeasures the site: boundaries, levels and what is there now, so the design starts from fact.
  • Geotechnical engineerTests the ground, so foundations are designed for what is under them.
  • Structural engineerDesigns the structure and signs it off for consent.
  • Quantity surveyorPrices the design independently before it is detailed, so the budget is tested early.
  • Council consent feesWhat the council charges to process and inspect the building consent.
  • PlannerPrepares the resource consent where the site’s rules need one.

Indicative only, confirmed after a site visit.

tell us about your project →

your project

What would yours cost?

Tell us about the project. contact →